PRE-DESIGN SURVEYS
:
| >> |
Soil
Resistivity Survey & Soil Analysis. |
| >> |
Current
Drainage Survey. |
| >> |
Identification
of Ground bed location. |
| >> |
Collection
of site data for sizing up an optimum design. |
ENGINEERING
DESIGN OF CP SYSTEMS
:
| >> |
Scheme
an optimum solution. |
| >> |
Sizing
up Design Methodology. |
| >> |
Drawing
out Detailed Specification. |
| >> |
Preparation
of Bill of Material. |
| >> |
Generation
of Relevant Drawings. |
| >> |
Detailing
the Quality Assurance Plan. |
| >> |
Installation
and Commissioning procedures. |
| |
|
SUPPLY
OF CP MATERIAL :
| >> |
Transformer
Rectifier Units. |
| >> |
High
Silicon Iron Anodes. |
| >> |
Mixed
Metal Oxide Anodes. |
| >> |
Different
types of Reference Electrodes. |
| >> |
Varieties
of Sacrificial Anodes. |
| >> |
CP
Cables. |
| >> |
Polarisation
Cells. |
| >> |
Zinc
Grounding Cells. |
| >> |
Flange
Insulation Kits. |
| >> |
Junction
Boxes & Test Stations. |
| >> |
Other
miscellaneous items. |
INSTALLATIONS
OF CP SYSTEMS :
| >> |
Our
Engineers are well trained to handle the installation
of different types of CP System comprising of- |
| >> |
T/R
Units. |
|
>>
|
Various
types of Anode Ground beds like-
Horizontal Anode Ground Bed.
Shallow Vertical Anode Ground Bed.
Deep Well Anode Ground Bed. |
| >> |
Associated
civil works. |
| >> |
And
other related activities. |
| |
|
TESTING
AND COMMISSIONONG OF THE CP SYSTEM
:
| >> |
After
carrying out the necessary cold checks, the CP System
is energised. |
| >> |
Tests
carried out to ensure the structure is adequately protected
with necessary fine tuning. |
| >> |
Interference
effect on the system as well as the other structures is
studied and remedial measures implemented. |
MONITORING
OF EXISTING CP SYSTEM
:
| >> |
Effective
monitoring of the system is carried out as per the pre
determined procedure and on course correction is done
to achieve the best results. |
POST
INSTALLATION SURVEYS
:
| >> |
Continuous
Potential Logging to obtain close interval PSP readings. |
| >> |
DCVG
Survey to assess the coating condition. |
| >> |
Pearsons
Survey to ascertain the coating condition. |
| >> |
CAT
Survey. |
| |
|
TROUBLE
SHOOTING AND REMEDIAL MEASURES
:
| >> |
Identification
of Stray current Source. |
| >> |
Ascertaining
the Interference. |
| >> |
Locating
the Current Drainage to secondary structures. |
| >> |
Recommendation
and Implementation of suitable remedial measures. |
|