The following services are :

>> Pre-design surveys

>> Engineering design of CP system

>> Supply of CP material

>> Installation of CP systems

>> Testing and commissioning of the CP system

>> Monitoring of existing CP system

>> Post installation surveys

>> Trouble shooting and remedial measures

 

PRE-DESIGN SURVEYS :

>> Soil Resistivity Survey & Soil Analysis.
>> Current Drainage Survey.
>> Identification of Ground bed location.
>> Collection of site data for sizing up an optimum design.

 

ENGINEERING DESIGN OF CP SYSTEMS :

>> Scheme an optimum solution.
>> Sizing up Design Methodology.
>> Drawing out Detailed Specification.
>> Preparation of Bill of Material.
>> Generation of Relevant Drawings.
>> Detailing the Quality Assurance Plan.
>> Installation and Commissioning procedures.
 


SUPPLY OF CP MATERIAL :

>> Transformer Rectifier Units.
>> High Silicon Iron Anodes.
>> Mixed Metal Oxide Anodes.
>> Different types of Reference Electrodes.
>> Varieties of Sacrificial Anodes.
>> CP Cables.
>> Polarisation Cells.
>> Zinc Grounding Cells.
>> Flange Insulation Kits.
>> Junction Boxes & Test Stations.
>> Other miscellaneous items.


INSTALLATIONS OF CP SYSTEMS :

>> Our Engineers are well trained to handle the installation of different types of CP System comprising of-
>> T/R Units.

>>

Various types of Anode Ground beds like-

Horizontal Anode Ground Bed.
Shallow Vertical Anode Ground Bed.
Deep Well Anode Ground Bed.
>> Associated civil works.
>> And other related activities.
 


TESTING AND COMMISSIONONG OF THE CP SYSTEM :

>> After carrying out the necessary cold checks, the CP System is energised.
>> Tests carried out to ensure the structure is adequately protected with necessary fine tuning.
>> Interference effect on the system as well as the other structures is studied and remedial measures implemented.



MONITORING OF EXISTING CP SYSTEM :

>> Effective monitoring of the system is carried out as per the pre determined procedure and on course correction is done to achieve the best results.



POST INSTALLATION SURVEYS :

>> Continuous Potential Logging to obtain close interval PSP readings.
>> DCVG Survey to assess the coating condition.
>> Pearson’s Survey to ascertain the coating condition.
>> CAT Survey.
 

 

TROUBLE SHOOTING AND REMEDIAL MEASURES :

>> Identification of Stray current Source.
>> Ascertaining the Interference.
>> Locating the Current Drainage to secondary structures.
>> Recommendation and Implementation of suitable remedial measures.